Full end to end data centre simulation and data centre infrastructure modelling software.
Use Quick SIM capability to make changes to the IT load, adjust the number of assets or test site performance under different external conditions.
EkkoSIM can run these for periods up to five years, with KPI analysis including energy usage, seasonal PUE, CO2 emissions, costs and capacity.
Created for electrical and mechanical systems based on performance design data from manufacturers.
Simulating cooling configurations such as air and water-cooled chillers, liquid-cooled IT racks, chilled water, split DX units, air-cooled chillers, liquid cooling IT racks, immersion cooling and air economizers.
With N+R and 2N+R resilience testing for both shared or staged loading, with power and cooling distribution circuits able to split and combine for performance simulation under failure scenarios.
Use the data center modeling software to present a thoroughly planned concept to consultants for discussion rather than going to them with a potentially expensive ‘blank canvas’.